A selection of recent turnkey projects and equipment supplies. Client names are confidential, but every reference can be verified — ask us for a contact in your industry.
480 m², ISO Class 5 / Grade A in Grade B background. EU GMP Annex 1 compliant, validated with full documentation. Design to handover in 14 weeks.
1,200 m², ISO Class 7 with ESD-safe surfaces. EC-motor FFU ceiling system, energy-optimized for high ambient temperatures. Turnkey construction plus operator training.
800 m² washdown-rated processing and packaging areas. HACCP-flow layout, corrosion-resistant envelope. Passed first-round BRCGS audit with zero hygiene non-conformities.
4 operating theatres, ISO Class 5 laminar flow. Prefabricated modules shipped flat-packed, installed with local team supervision.
900+ FFU units with EC motors and group control. Two-year supply program; per-unit test reports for every shipment.
Overview. A Spanish pharmaceutical manufacturer needed a new sterile fill-finish suite to launch a lyophilized injectable product line. The facility had to comply with the revised EU GMP Annex 1 and pass inspection by the national regulator on the first attempt.
Scope. Cleanroom design and CFD airflow simulation; magnesium rock-wool panels, flush doors and windows; Grade A laminar airflow zones with H14 terminal filtration; HVAC with pressure cascade control and BMS integration; commissioning, qualification (IQ/OQ/PQ) and certification.
| Area | 480 m² |
|---|---|
| Classification | ISO 5 (Grade A) / ISO 7 (Grade B background) |
| Temperature / RH | 20 ± 2 °C / 45 ± 10 % |
| Timeline | 14 weeks from design approval to handover |
Challenge & solution. The existing building had a low ceiling height that ruled out conventional ductwork above the Grade A zone. We solved this with a recirculating FFU ceiling system integrated into the panel ceiling — achieving unidirectional airflow without raising the roof.
Results. The suite passed regulatory inspection on the first attempt. Particle counts measured at 30–50% below ISO Class 5 limits at rest, giving the client comfortable operating margin.
Talk to the engineers who delivered it. Free design proposal within 24 hours.
Talk to Our Engineers